A full stewarding and search plan approved by the safety advisory group, delivered across two days without a capacity incident.
Licensing first, then 5,000 people through the gate twice
An independent promoter needed a stewarding and search plan robust enough to satisfy the local authority safety advisory group before a licence would be granted. The site was a park with two temporary entrances, a single main stage, and neighbouring residential streets that constrained egress routes.
With doors opening at the same hour on both days, entry throughput was the critical risk: a slow search line would queue onto a public road. The promoter also needed a control point that could hold radio contact with medical, the bar operator, and their own operations lead without three separate conversations.
How we mobilised and ran the contract
- 1Plan written for the SAGWe produced the stewarding, search, and egress plan submitted to the safety advisory group, and attended the meeting to answer it.
- 2Search and entry teamsSearch lanes sized to the expected arrival curve, with a supervisor per lane and a rejected-items and refusals procedure agreed in advance.
- 3Pit, barrier and responseFront-of-stage pit team, barrier stewards on both flanks, and a mobile response team held for incidents away from the stage.
- 4Single control pointOne control position holding radio contact with medical, bar, and the promoter's operations lead, logging every incident with a time.
Licensed, cleared ahead of schedule, and debriefed into next year's plan
The plan they wrote is what got us through the safety advisory group. On the day the gate cleared early both times, which has never happened for us before.
The elements of this contract
Each service on this contract is available on its own or as part of a combined arrangement.
Similar work
- Reading, Berkshire
Combined guarding and daily cleaning for a corporate campus
Two contracts consolidated into one point of accountabilityRead the case studyOffices & Corporate - Central London
Loss prevention and front-of-house presence across four stores
Measurable reduction in recorded shrinkage across all four sitesRead the case studyRetail - Birmingham City Centre
Waking watch for a 148-unit block during cladding remediation
Compliant cover mobilised within 48 hours of instructionRead the case studyResidential & Managing Agents
Need advice for your own site?
Talk to us about security, cleaning, or facilities management. We’ll look at your site and tell you what it actually needs.